Product Details
Certification: ISO
Payment & Shipping Terms
Automation: |
Automatic |
Screw: |
Twin-Screw |
Treatment: |
Burning |
Fuel: |
Diesel Oil, Natural Gas, Lps |
Service Life: |
10-15 Years |
Factory Establishment: |
2013 |
Voltage: |
380V/220V |
Blackness Of Exhaustion: |
Ringelman <1 |
Type Of Waste: |
Solid Waste |
Feeding Type: |
Pumping |
Burning Rate: |
99.9% |
Emission Standard: |
European Standard |
Transport Package: |
Container, Bulk Cargo |
Specification: |
Customized |
Trademark: |
ZDHJ |
Origin: |
Jiangsu, China |
HS Code: |
8417809090 |
Supply Ability: |
100sets/Year |
Customization: |
Available |
After-sales Service: |
Installation Guide |
Warranty: |
1 Year |
Automation: |
Automatic |
Screw: |
Twin-Screw |
Treatment: |
Burning |
Fuel: |
Diesel Oil, Natural Gas, Lps |
Service Life: |
10-15 Years |
Factory Establishment: |
2013 |
Voltage: |
380V/220V |
Blackness Of Exhaustion: |
Ringelman <1 |
Type Of Waste: |
Solid Waste |
Feeding Type: |
Pumping |
Burning Rate: |
99.9% |
Emission Standard: |
European Standard |
Transport Package: |
Container, Bulk Cargo |
Specification: |
Customized |
Trademark: |
ZDHJ |
Origin: |
Jiangsu, China |
HS Code: |
8417809090 |
Supply Ability: |
100sets/Year |
Customization: |
Available |
After-sales Service: |
Installation Guide |
Warranty: |
1 Year |
Sludge Flue Gas Drying and Blending Combustion Treatment with Diesel Oil Assistance
Production Description:
In deep cooperation with Southeast University, we jointly design and develop a variety of fluidized bed dry incineration technologies, specializing in providing one-stop overall solutions for sludge drying, sludge incineration and sludge resource treatment.
We have a number of invention and utility model patents, and successfully used in a number of projects, to solve the difficulty of sludge drying and incineration treatment, pollution, high cost problems, to avoid secondary pollution,bring breakthrough progress to China's sludge treatment and disposal technology .
We will choose different technology according to the actual situation of different projects to ensure long-term stable operation of the project ,Achieve as low investment, high return as possible .
Process Diagram: